Buying a factory is a bigger decision than buying an office or a house: the building has to suit how you make, store and move goods, and the land title has to allow it. This guide follows the steps most buyers in Selangor, Kuala Lumpur, Negeri Sembilan and Johor go through, with the points to check at each one.
It is general information, not legal or tax advice. Appoint a lawyer for the purchase and confirm the current rules with them, your bank and the authorities.
1. Set your requirements
Write down what the operation needs before you look at listings:
- Built-up area for production, storage and offices, and land area for parking, loading and future extension.
- Power supply. Malaysian listings usually quote it in amps (for example 200A or 400A, three-phase). Heavy machinery may need a higher supply or a substation; ask TNB or an electrical consultant what your load requires.
- Floor loading, if you will install heavy machines or high racking.
- Ceiling (eave) height, for racking, overhead cranes or tall equipment.
- Access: road width and turning space for 40-foot container trailers, loading bays, and the distance to ports, highways and your workforce.
- The type of industry. Light, medium and heavy industry are zoned differently, and some processes need approval from the Department of Environment (DOE).
2. Work out the budget and financing
Banks lend on industrial property, but terms are usually stricter than for homes, so speak to banks early and get an indication of the loan you qualify for. Besides the price, budget for:
- legal fees for the sale and purchase agreement (SPA) and the loan agreement;
- stamp duty on the transfer and on the loan agreement;
- valuation fees;
- renovation, fit-out and any power upgrade;
- the deposits described in step 5.
If you are buying through a company, ask your accountant how the purchase should be structured before you sign anything.
3. Shortlist and inspect
Visit the factories on your shortlist, ideally more than once and in wet weather. Look at:
- the structure, roof and gutters, for leaks and cracks;
- drainage, and whether the area has a history of flooding;
- fire safety installations such as hose reels, extinguishers and sprinklers;
- the condition of the office, toilets and compound;
- what the neighbouring factories do — noise, smells or heavy traffic may affect you.
4. Check the title, approvals and the building's papers
Your lawyer does most of this, but it helps to know what to ask:
- Land search. An official search at the land office shows the registered owner, the tenure, the category of land use (it should be industry) and any express conditions, restrictions in interest, charges (bank loans) or caveats.
- Express conditions. They can limit the type of industry allowed on the land; make sure yours fits.
- Tenure. Freehold, or leasehold with its expiry date. Many leasehold titles need State Authority consent to transfer or charge the land, which adds time.
- Certificate of Completion and Compliance (CCC) — or Certificate of Fitness (CF) for buildings completed before the CCC system started in 2007. Check that every extension and mezzanine was approved: unapproved extensions are common and can be costly to put right.
- Quit rent (cukai tanah) and assessment (cukai taksiran) paid up to date.
- Bumiputera and other restrictions. Some industrial lots, especially in new projects, are reserved for Bumiputera buyers or carry other conditions.
- Foreign buyers. Purchases by foreign individuals or foreign-owned companies need State Authority approval and may be subject to minimum prices that differ from state to state; check the current rules with your lawyer.
5. Make an offer
When you agree on a price, you sign a letter of offer and pay an earnest deposit, commonly 2–3% of the price. The rest of the 10% deposit is usually paid when the SPA is signed, typically a few weeks later. Agree in writing what the price includes — fixtures, a power upgrade, an existing tenancy — and any conditions of the sale.
6. Sign the SPA and arrange the loan
The lawyers prepare the SPA, which sets the completion period: commonly three months from signing, or from the date State Authority consent is obtained, often with a one-month extension on payment of late interest.
Your bank issues its letter of offer and its lawyers prepare the loan documents. Stamp duty on the memorandum of transfer is charged on a sliding scale under the Stamp Act 1949; ask your lawyer for the current rates and any exemptions.
7. Complete and move in
On completion the balance of the price is paid (mostly by your bank), the transfer is presented for registration and you receive vacant possession and the keys. Then:
- transfer the electricity and water accounts into your name;
- update the owner's details with the local council and the land office;
- insure the building, usually with fire and allied perils cover;
- apply for the business premise licence from the local council and any other licence your activity needs. Manufacturing companies with shareholders' funds of RM2.5 million or more, or 75 or more full-time employees, also need a manufacturing licence from MIDA under the Industrial Co-ordination Act 1975.
How EstateGrid helps
Factory listings on EstateGrid show the land and built-up area, power supply, ceiling height, floor loading and tenure where the owner or developer has provided them, so you can shortlist quickly. GH NG arranges viewings, checks the details with the owner and can connect you with financing, renovation and construction services when you need them.
Frequently asked questions
Can a company buy a factory in Malaysia?
Yes. Factories are commonly bought in the name of a private limited company (Sdn Bhd). If the company is foreign-owned, the purchase usually needs State Authority approval and minimum prices may apply.
What is the difference between a CF and a CCC?
Both confirm that a building is fit to occupy. Local councils issued the Certificate of Fitness (CF) until 2007; since then buildings receive a Certificate of Completion and Compliance (CCC), certified by the project's architect or engineer. Older factories have a CF, newer ones a CCC.
How long does it take to buy a factory?
For a straightforward purchase, completion is commonly three to four months after the SPA is signed. It takes longer when State Authority consent is needed, as it is for many leasehold titles and for foreign buyers.
Do I need a licence to run a factory?
You need a business premise licence from the local council and, depending on the activity, approvals from the Fire and Rescue Department (BOMBA) and the Department of Environment. Above certain size thresholds, manufacturers also need a manufacturing licence from MIDA.